Por favor, use este identificador para citar o enlazar este ítem: http://repositorio.uan.edu.co/handle/123456789/3191
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorYepes Heredia, Jairo Edmundo-
dc.creatorParra Monzón, Sebastián-
dc.date.accessioned2021-03-11T03:07:25Z-
dc.date.available2021-03-11T03:07:25Z-
dc.date.created2020-01-25-
dc.identifier.urihttp://repositorio.uan.edu.co/handle/123456789/3191-
dc.descriptionPropiaes_ES
dc.description.abstractThe degree work has focused on achieving the correct constructive practices of monitoring and control of daily, weekly and monthly activities carried out by the company for its different contracts and works throughout Cundinamarca and Colombia. This is done through an online weekly verification format that is consistent with each contract, city and budgeted amounts. It also consisted of the opportunity for the practitioner to develop communication and decision-making tasks with the parties to the contract, namely: Audit and the contracting company. The format and proposals established by the practitioner focused on the same principles as a construction management software package. Free online resources were used to carry out the practitioner's proposal, working on a free version of Onedrive and Excel Microsoft online. The actions developed were able to increase the efficiency in the report of works to the work management and management of the company and in turn this developed better processes for preparing partial delivery certificates as well as their corresponding payments.es_ES
dc.description.tableofcontentsEl trabajo de grado se ha enfocado en lograr las correctas prácticas constructivas de seguimiento y control de las actividades diarias, semanales y mensuales que realiza la empresa para sus diferentes contratos y obras en Cundinamarca y Colombia. Esto se hace a través de un formato de verificación semanal en línea que es consistente con cada contrato, ciudad y montos presupuestados. También consistió en la oportunidad para el profesional de desarrollar tareas de comunicación y toma de decisiones con las partes del contrato, a saber: Auditoría y la empresa contratante. El formato y las propuestas establecidas por el profesional se centraron en los mismos principios que un paquete de software de gestión de la construcción. Se utilizaron recursos online gratuitos para llevar a cabo la propuesta del practicante, trabajando en una versión gratuita de Onedrive y Excel Microsoft online. Las acciones desarrolladas lograron incrementar la eficiencia en el reporte de obras a la dirección y dirección de obra de la empresa y a su vez esto desarrolló mejores procesos para la elaboración de certificados de entrega parcial así como sus correspondientes pagos.es_ES
dc.language.isoenges_ES
dc.publisherUniversidad Antonio Nariñoes_ES
dc.rightsAtribución-CompartirIgual 3.0 Estados Unidos de América*
dc.rightsAtribución-CompartirIgual 3.0 Estados Unidos de América*
dc.rights.urihttp://creativecommons.org/licenses/by-sa/3.0/us/*
dc.sourceinstname:Universidad Antonio Nariñoes_ES
dc.sourcereponame:Repositorio Institucional UANes_ES
dc.sourceinstname:Universidad Antonio Nariñoes_ES
dc.sourcereponame:Repositorio Institucional UANes_ES
dc.subjectSistema de gestión de información de construcciónes_ES
dc.subjectGestión de la construcciónes_ES
dc.subjecttecnologías basadas en webes_ES
dc.titleImplementation of an online format for monitoring and control of multi-project activities for the company gyr construcciones S.A.Ses_ES
dc.publisher.programIngeniería Civiles_ES
dc.rights.accesRightsopenAccesses_ES
dc.subject.keywordConstruction information management systemes_ES
dc.subject.keywordConstruction managementes_ES
dc.subject.keywordweb-based technologieses_ES
dc.type.spaTrabajo de grado (Pregrado y/o Especialización)es_ES
dc.type.hasVersioninfo:eu-repo/semantics/acceptedVersiones_ES
dc.source.bibliographicCitationAli, M. M., & Al-Kodmany, K. (2012). Tall Buildings and Urban Habitat of the 21st Century: A Global Perspective. Buildings, 2(4), 384–423. https://doi.org/10.3390/buildings2040384es_ES
dc.source.bibliographicCitationChan, S. L., & Leung, N. N. (2004). Prototype web-based construction project management system. Journal of Construction Engineering and Management, 130(6), 935–943. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(935)es_ES
dc.source.bibliographicCitationCouncil on Tall Buildings and Urban Habitat. (1995) Architecture of Tall Buildings, McGraw Hill, U.S.A. 408.es_ES
dc.source.bibliographicCitationICONTEC. (2015). Norma_Iso9001_2015. SISTEMAS DE GESTIÓN DE LA CALIDAD. REQUISITOS. Recovered from http://www.minvivienda.gov.co/Documentses_ES
dc.source.bibliographicCitationMarques, B., Sousa-pinto, B., & Silva-costa, T. (2017). IT Management of Building Materials’ Planning and Control Processes Using Web-Based Technologies. (April). https://doi.org/10.1007/978-3-319-56538-5es_ES
dc.source.bibliographicCitationMinisterio de educación nacional, C. (2008). Manual de procedimientos interventoria y supervisión de contratos. 24es_ES
dc.source.bibliographicCitationMoisés Ortiz. (2011). Acerca - Excel Total. Moisés Ortiz, p. 3. Retrieved from https://exceltotal.com/acerca/es_ES
dc.source.bibliographicCitationOzorhon, B., Karatas, C. G., & Demirkesen, S. (2014). A Web-based Database System for Managing Construction Project Knowledge. Procedia - Social and Behavioral Sciences, 119(1995), 377–386. https://doi.org/10.1016/j.sbspro.2014.03.043es_ES
dc.source.bibliographicCitationPmbok Guide. (2000). A Guide to the Project Knowledge Body of Management (PMBOK® Guide) Third edition (Vol. 3). https://doi.org/10.1093/ajcp/69.5.475es_ES
dc.source.bibliographicCitationSánchez Henao, J. C. (2010). Interventoría de proyectos y obras. In International Journal of Man-Machine Studies (Vol. 8). https://doi.org/10.1016/S0020-7373(76)80001-6es_ES
dc.source.bibliographicCitationSanchez, J. C. N. de C. (2010). INTERVENTORÍA DE PROYECTOS Y OBRAS. Retrieved from http://www.ghbook.ir/index.php?name=&option=com_dbook&task=readonline&book_id= 13650&page=73&chkhashk=ED9C9491B4&Itemid=218&lang=fa&tmpl=componentes_ES
dc.source.bibliographicCitationSarmiento, D. A., Sosa, J. M., Sanchez, G. A., & Angarita, G. (2018). Seguimiento y control para la obra de infraestructura vial bajo la metodología PMI en el municipio de Madrid Cundinamarca. (September), 160–164.es_ES
dc.source.bibliographicCitationScott, D., Cheong, M., & Li, H. (2012). Web-based Construction Information Management System. Construction Economics and Building, 3(1), 43–52. https://doi.org/10.5130/ajceb.v3i1.2910es_ES
dc.source.bibliographicCitationUrdaneta, H. G., & Pontificia Universidad Javeriana (Bogotá). (1998). Interventoría de la obra pública. Santafé de Bogotá: Centro Editorial Javeriano, CEJA.es_ES
dc.source.bibliographicCitationThe Construction Industry. (1996). MODEL FOR PARTNERING EXCELLENCE. Model for Partnering Excellence, (November).es_ES
dc.source.bibliographicCitationSharpe, R (1995). IT in the Construction Engineering Future Directions, lE Australia Forum. Sydney 21 February and Melbourne 22 February 1995es_ES
dc.source.bibliographicCitationZhu, Yimin (1999). Web-based Construction Document Processing through a Malleable Frame. Ph.D. thesis, University of Florida. UMI, Ann Arbor, USAes_ES
dc.description.degreenameIngeniero(a) Civiles_ES
dc.description.degreelevelPregradoes_ES
dc.publisher.facultyFacultad de Ingeniería Civiles_ES
dc.description.notesPresenciales_ES
dc.creator.cedula1010216781es_ES
dc.publisher.campusBogotá - Sur-
Aparece en las colecciones: Ingeniería civil

Ficheros en este ítem:
Fichero Tamaño  
2020SebastianParraMonzon.pdf2.83 MBVisualizar/Abrir
2020AutorizaciondeAutores.pdf
  Restricted Access
824.06 kBVisualizar/Abrir  Request a copy


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons