Por favor, use este identificador para citar o enlazar este ítem:
http://repositorio.uan.edu.co/handle/123456789/3191
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Yepes Heredia, Jairo Edmundo | - |
dc.creator | Parra Monzón, Sebastián | - |
dc.date.accessioned | 2021-03-11T03:07:25Z | - |
dc.date.available | 2021-03-11T03:07:25Z | - |
dc.date.created | 2020-01-25 | - |
dc.identifier.uri | http://repositorio.uan.edu.co/handle/123456789/3191 | - |
dc.description | Propia | es_ES |
dc.description.abstract | The degree work has focused on achieving the correct constructive practices of monitoring and control of daily, weekly and monthly activities carried out by the company for its different contracts and works throughout Cundinamarca and Colombia. This is done through an online weekly verification format that is consistent with each contract, city and budgeted amounts. It also consisted of the opportunity for the practitioner to develop communication and decision-making tasks with the parties to the contract, namely: Audit and the contracting company. The format and proposals established by the practitioner focused on the same principles as a construction management software package. Free online resources were used to carry out the practitioner's proposal, working on a free version of Onedrive and Excel Microsoft online. The actions developed were able to increase the efficiency in the report of works to the work management and management of the company and in turn this developed better processes for preparing partial delivery certificates as well as their corresponding payments. | es_ES |
dc.description.tableofcontents | El trabajo de grado se ha enfocado en lograr las correctas prácticas constructivas de seguimiento y control de las actividades diarias, semanales y mensuales que realiza la empresa para sus diferentes contratos y obras en Cundinamarca y Colombia. Esto se hace a través de un formato de verificación semanal en línea que es consistente con cada contrato, ciudad y montos presupuestados. También consistió en la oportunidad para el profesional de desarrollar tareas de comunicación y toma de decisiones con las partes del contrato, a saber: Auditoría y la empresa contratante. El formato y las propuestas establecidas por el profesional se centraron en los mismos principios que un paquete de software de gestión de la construcción. Se utilizaron recursos online gratuitos para llevar a cabo la propuesta del practicante, trabajando en una versión gratuita de Onedrive y Excel Microsoft online. Las acciones desarrolladas lograron incrementar la eficiencia en el reporte de obras a la dirección y dirección de obra de la empresa y a su vez esto desarrolló mejores procesos para la elaboración de certificados de entrega parcial así como sus correspondientes pagos. | es_ES |
dc.language.iso | eng | es_ES |
dc.publisher | Universidad Antonio Nariño | es_ES |
dc.rights | Atribución-CompartirIgual 3.0 Estados Unidos de América | * |
dc.rights | Atribución-CompartirIgual 3.0 Estados Unidos de América | * |
dc.rights.uri | http://creativecommons.org/licenses/by-sa/3.0/us/ | * |
dc.source | instname:Universidad Antonio Nariño | es_ES |
dc.source | reponame:Repositorio Institucional UAN | es_ES |
dc.source | instname:Universidad Antonio Nariño | es_ES |
dc.source | reponame:Repositorio Institucional UAN | es_ES |
dc.subject | Sistema de gestión de información de construcción | es_ES |
dc.subject | Gestión de la construcción | es_ES |
dc.subject | tecnologías basadas en web | es_ES |
dc.title | Implementation of an online format for monitoring and control of multi-project activities for the company gyr construcciones S.A.S | es_ES |
dc.publisher.program | Ingeniería Civil | es_ES |
dc.rights.accesRights | openAccess | es_ES |
dc.subject.keyword | Construction information management system | es_ES |
dc.subject.keyword | Construction management | es_ES |
dc.subject.keyword | web-based technologies | es_ES |
dc.type.spa | Trabajo de grado (Pregrado y/o Especialización) | es_ES |
dc.type.hasVersion | info:eu-repo/semantics/acceptedVersion | es_ES |
dc.source.bibliographicCitation | Ali, M. M., & Al-Kodmany, K. (2012). Tall Buildings and Urban Habitat of the 21st Century: A Global Perspective. Buildings, 2(4), 384–423. https://doi.org/10.3390/buildings2040384 | es_ES |
dc.source.bibliographicCitation | Chan, S. L., & Leung, N. N. (2004). Prototype web-based construction project management system. Journal of Construction Engineering and Management, 130(6), 935–943. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(935) | es_ES |
dc.source.bibliographicCitation | Council on Tall Buildings and Urban Habitat. (1995) Architecture of Tall Buildings, McGraw Hill, U.S.A. 408. | es_ES |
dc.source.bibliographicCitation | ICONTEC. (2015). Norma_Iso9001_2015. SISTEMAS DE GESTIÓN DE LA CALIDAD. REQUISITOS. Recovered from http://www.minvivienda.gov.co/Documents | es_ES |
dc.source.bibliographicCitation | Marques, B., Sousa-pinto, B., & Silva-costa, T. (2017). IT Management of Building Materials’ Planning and Control Processes Using Web-Based Technologies. (April). https://doi.org/10.1007/978-3-319-56538-5 | es_ES |
dc.source.bibliographicCitation | Ministerio de educación nacional, C. (2008). Manual de procedimientos interventoria y supervisión de contratos. 24 | es_ES |
dc.source.bibliographicCitation | Moisés Ortiz. (2011). Acerca - Excel Total. Moisés Ortiz, p. 3. Retrieved from https://exceltotal.com/acerca/ | es_ES |
dc.source.bibliographicCitation | Ozorhon, B., Karatas, C. G., & Demirkesen, S. (2014). A Web-based Database System for Managing Construction Project Knowledge. Procedia - Social and Behavioral Sciences, 119(1995), 377–386. https://doi.org/10.1016/j.sbspro.2014.03.043 | es_ES |
dc.source.bibliographicCitation | Pmbok Guide. (2000). A Guide to the Project Knowledge Body of Management (PMBOK® Guide) Third edition (Vol. 3). https://doi.org/10.1093/ajcp/69.5.475 | es_ES |
dc.source.bibliographicCitation | Sánchez Henao, J. C. (2010). Interventoría de proyectos y obras. In International Journal of Man-Machine Studies (Vol. 8). https://doi.org/10.1016/S0020-7373(76)80001-6 | es_ES |
dc.source.bibliographicCitation | Sanchez, J. C. N. de C. (2010). INTERVENTORÍA DE PROYECTOS Y OBRAS. Retrieved from http://www.ghbook.ir/index.php?name=&option=com_dbook&task=readonline&book_id= 13650&page=73&chkhashk=ED9C9491B4&Itemid=218&lang=fa&tmpl=component | es_ES |
dc.source.bibliographicCitation | Sarmiento, D. A., Sosa, J. M., Sanchez, G. A., & Angarita, G. (2018). Seguimiento y control para la obra de infraestructura vial bajo la metodología PMI en el municipio de Madrid Cundinamarca. (September), 160–164. | es_ES |
dc.source.bibliographicCitation | Scott, D., Cheong, M., & Li, H. (2012). Web-based Construction Information Management System. Construction Economics and Building, 3(1), 43–52. https://doi.org/10.5130/ajceb.v3i1.2910 | es_ES |
dc.source.bibliographicCitation | Urdaneta, H. G., & Pontificia Universidad Javeriana (Bogotá). (1998). Interventoría de la obra pública. Santafé de Bogotá: Centro Editorial Javeriano, CEJA. | es_ES |
dc.source.bibliographicCitation | The Construction Industry. (1996). MODEL FOR PARTNERING EXCELLENCE. Model for Partnering Excellence, (November). | es_ES |
dc.source.bibliographicCitation | Sharpe, R (1995). IT in the Construction Engineering Future Directions, lE Australia Forum. Sydney 21 February and Melbourne 22 February 1995 | es_ES |
dc.source.bibliographicCitation | Zhu, Yimin (1999). Web-based Construction Document Processing through a Malleable Frame. Ph.D. thesis, University of Florida. UMI, Ann Arbor, USA | es_ES |
dc.description.degreename | Ingeniero(a) Civil | es_ES |
dc.description.degreelevel | Pregrado | es_ES |
dc.publisher.faculty | Facultad de Ingeniería Civil | es_ES |
dc.description.notes | Presencial | es_ES |
dc.creator.cedula | 1010216781 | es_ES |
dc.publisher.campus | Bogotá - Sur | - |
Aparece en las colecciones: | Ingeniería civil |
Ficheros en este ítem:
Fichero | Tamaño | |
---|---|---|
2020SebastianParraMonzon.pdf | 2.83 MB | Visualizar/Abrir |
2020AutorizaciondeAutores.pdf Restricted Access | 824.06 kB | Visualizar/Abrir Request a copy |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons