Por favor, use este identificador para citar o enlazar este ítem: http://repositorio.uan.edu.co/handle/123456789/4932
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorManrique Flórez, Oscar Fernando-
dc.coverage.spatialNeiva (Huila, Colombia)es_ES
dc.creatorPerdomo Garcia, Wendy Lizeth-
dc.date.accessioned2021-09-29T15:00:08Z-
dc.date.available2021-09-29T15:00:08Z-
dc.date.created2021-05-29-
dc.identifier.urihttp://repositorio.uan.edu.co/handle/123456789/4932-
dc.description.abstractThis research work covers the subject of white work in construction through 3 specific pillars such as: labor (physical and mental effort that is used to carry out a job), performance (amount of work of some activity completely executed by a crew), waste (construction waste) and seeks to provide a solution to the different problems that throughout history have been repeated in the construction sector and that in the end have an effect on the project's economy (Budget); All this through the use of a file that allows specifically monitoring and controlling the fl ooring activity, which was identified through surveys carried out with different professionals, which is where there is an increase in the percentage of waste, lower yields, and in some cases unskilled labor.es_ES
dc.description.tableofcontentsEste trabajo de investigación abarca el tema de la obra blanca en la construcción mediante 3 pilares específicos como lo son: mano de obra ( esfuerzo físico y mental que se emplea para realizar un trabajo),rendimiento ( completamente ejecutada por una cuadrilla cantidad de obra de alguna actividad ), desperdicios (residuos de obra) y busca darle solución a las diferentes problemáticas que a través de la historia se han visto reiteradas en el sector de la construcción y que al final tienen una afectación sobre la economía del proyecto (Presupuesto); todo esto mediante el uso de una ficha que permita monitorea r y controlar específicamente la actividad enchape de pisos la cual se identificó a través de unas encuestas realizadas a diferentes profesionales que es donde se presenta un aumento en el porcentaje del desperdicio, menores rendimientos, y en algunos cas os mano de obra no calificada.es_ES
dc.language.isospaes_ES
dc.publisherUniversidad Antonio Nariñoes_ES
dc.rightsAtribución-SinDerivadas 3.0 Estados Unidos de América*
dc.rights.urihttp://creativecommons.org/licenses/by-nd/3.0/us/*
dc.sourceinstname:Universidad Antonio Nariñoes_ES
dc.sourcereponame:Repositorio Institucional UANes_ES
dc.sourceinstname:Universidad Antonio Nariñoes_ES
dc.sourcereponame:Repositorio Institucional UANes_ES
dc.subjectPlaneación de la construcciónes_ES
dc.subjectAcabados de obraes_ES
dc.subjectPisos y paredes cerámicoses_ES
dc.subjectControl de seguimientoes_ES
dc.titleDispositivo de apoyo en los procesos de implementación y seguimiento de la ISO 9001 en las empresas de construcción. Actividad de enchape de piso en vivienda multifamiliares_ES
dc.typeTesis - Trabajo de grado - Monografia - Pregradoes_ES
dc.publisher.programArquitecturaes_ES
dc.rights.accesRightsopenAccesses_ES
dc.subject.keywordConstruction Planning, Follow-up controles_ES
dc.subject.keywordConstruction finisheses_ES
dc.subject.keywordCeramic Floors and Wallses_ES
dc.subject.keywordFollow-up controles_ES
dc.type.spaTrabajo de grado (Pregrado y/o Especialización)es_ES
dc.type.hasVersioninfo:eu-repo/semantics/acceptedVersiones_ES
dc.source.bibliographicCitationANTONIO, A. S. (Santiago de chile, 2016). Uiversidad de chile, facultad de ciencias fisicas y matematicas, Departamento de ingeieria civil. Recuperado el 17 de Marzo de 2020, de http://repositorio.uchile.cl/bitstream/handle/2250/141763/Desarrollar-un-manual-de-procedimientos-para-la-planificacion-de-obras-de-construccion-de-edificios.pdf?sequence=1&isAllowed=yes_ES
dc.source.bibliographicCitationArq. Julio Cesar Perez Cervantes. (s.f.). Planeación y control de obra ( Capitulo 1 ). Recuperado el 16 de marzo de 2020, de http://catarina.udlap.mx/u_dl_a/tales/documentos/mgc/perez_c_jc/capitulo1.pdfes_ES
dc.source.bibliographicCitationCalidad, G. d. (16 de Octubre de 2018). Nueva ISO 9001: 2015. Obtenido de https://www.nueva-iso-9001-2015.com/2018/10/quiere-saber-lo-que-significa-la-gestion-de-calidad/es_ES
dc.source.bibliographicCitationCamacol, & Sena . (2013). Proyecto de la investigación del sector de la construcción de edificaciones en colombia.es_ES
dc.source.bibliographicCitationCEPAL. (s.f.). Presentación en power point - cepal . Obtenido de https://www.cepal.org/ilpes/noticias/paginas/2/33602/SegundoModulo.pdfes_ES
dc.source.bibliographicCitationColombia, M. (s.f.). Bogotá: epicentro de convenciones, congresos y eventos internacionales. Obtenido de https://www.colombia.co/pais-colombia/hechos/bogota-epicentro-de-convenciones-congresos-eventos-internacionales/es_ES
dc.source.bibliographicCitationDANE, G. (Marzo 06 de 2020). Boletin tecnico Indicadores alrededor de la Construcción ( IEAC). Colombia: Estadisticas del mercado laboral .es_ES
dc.source.bibliographicCitationDIAZ, J. E., & PORRAS MOYAS, D. A. (2015). Universidad catolica de colombia, Facultad de ingenieria, Modalidad de investigación tegnologica. Recuperado el 17 de Marzo de 2020, de https://repository.ucatolica.edu.co/bitstream/10983/2951/4/LA%20PLANEACI%C3%93N%20Y%20EJECUCI%C3%93N%20DE%20LAS%20OBRAS%20DE%20CONSTRUCCI%C3%93N%20DENTRO%20DE%20LAS%20BUENAS%20PR%C3%81CTICAS%20DE%20LA%20ADMIN.pdfes_ES
dc.source.bibliographicCitationDNP, & UNOPS, F. (s.f.). Estructuración de proyectos de infrastructura, etapa de preinversión. En Variable problematica u oportunidad (págs. 1-2). Colombia .es_ES
dc.source.bibliographicCitationGiraldo, L. (2018). Errores mas frecuentes de las constrcutoras. Revista en obra .es_ES
dc.description.degreenameArquitecto(a)es_ES
dc.description.degreelevelPregradoes_ES
dc.publisher.facultyFacultad de Arteses_ES
dc.audienceEspecializadaes_ES
dc.description.notesPresenciales_ES
dc.creator.cedula20611319915es_ES
dc.publisher.campusNeiva Buganvileses_ES
dc.description.degreetypeMonografíaes_ES
Aparece en las colecciones: Arquitectura

Ficheros en este ítem:
Fichero Tamaño  
2021_WendyLizethPerdomoGarcía_Autorización
  Restricted Access
1.15 MBVisualizar/Abrir  Request a copy
2021_WendyLizethPerdomoGarcía2.92 MBVisualizar/Abrir
2021_WendyLizethPerdomoGarcía_Acta
  Restricted Access
372.84 kBVisualizar/Abrir  Request a copy


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons