Por favor, use este identificador para citar o enlazar este ítem:
http://repositorio.uan.edu.co/handle/123456789/6830
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.creator | Meza De La Cruz, Luis Fernando | - |
dc.date.accessioned | 2022-08-24T00:25:18Z | - |
dc.date.available | 2022-08-24T00:25:18Z | - |
dc.date.created | 2022-05-11 | - |
dc.identifier.uri | http://repositorio.uan.edu.co/handle/123456789/6830 | - |
dc.description.abstract | This Project is aligned to the research project No 2022008 that is approved by the Vice President for Science, Technology and Innovation of the Antonio Nariño University, which is entitled: "Development of statistical techniques for the analysis of uncertainty and metrological performance in industrial equipment". Although the projects seek similar objectives, while the project approved by the VCTI focuses on industrial equipment for hydroelectric power generators in a hydroelectric plant in Rio de Janeiro (Brazil), this degree project applies the methodology proposed for another industrial equipment, that is, an internal combustion engine. Thus, this project arises with the alternative solution to the problem that affects the efficiency in the process and production in industrial plants or in any other area where there are associated temperature measurements. This is due to the fact that there is no exact reading of the constant temperature in the measurand. It was important to carry out this research since it focuses on the comparison study between the Monte Carlo method and the GUM method, in terms of the metrological reliability of industrial processes, that is, in the analysis of measurement uncertainty. To achieve the objectives pursued, sensors were used to measure the temperature of an internal combustion engine, as well as a scale to measure fuel consumption. The results allowed verifying the applicability of both methods in search of the continuous improvement of thermal processes at an industrial level. | es_ES |
dc.description.tableofcontents | Este Proyecto de Grado se encuentra alineado al proyecto de investigación No 2022008 que está aprobado por la Vicerrectoría de Ciencia, Tecnología e Innovación de la Universidad Antonio Nariño, el cual se titula: “Desarrollo de técnicas estadísticas para el análisis de incertidumbre y desempeño metrológico en equipos industriales”. A pesar que los proyectos buscan objetivos similares, mientras el proyecto aprobado por la VCTI se enfoca en equipos industriales de hidrogeneradores de energía en una planta hidroeléctrica de Rio de Janeiro (Brasil), este proyecto de grado aplica la metodología propuesta para otro equipo industrial, es decir, un motor de combustión interna. Así, este proyecto surge con la alternativa de solución al problema que afecta la eficiencia en el proceso y producción en plantas industriales o en cualquier otra área donde existan mediciones de temperatura asociadas. Lo anterior debido a que no que hay una lectura exacta de la temperatura constante en el mensurado. Fue importante realizar esta investigación ya que se centra en el estudio de comparación, entre el método de Monte Carlo y el método de GUM, en términos de la confiabilidad metrológica de los procesos industriales, es decir, en el análisis de incertidumbre de medición. Para lograr los objetivos perseguidos ser hizo uso los sensores para la medición de temperatura de un motor de combustión interna, además de una báscula para la medición del consumo de combustible. Los resultados permitieron verificar la aplicabilidad de ambos métodos en búsqueda de la mejora continuo de los procesos térmicos a nivel industrial. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Universidad Antonio Nariño | es_ES |
dc.rights | Atribución-NoComercial-SinDerivadas 3.0 Estados Unidos de América | * |
dc.rights | Atribución-NoComercial-SinDerivadas 3.0 Estados Unidos de América | * |
dc.rights | Atribución-NoComercial-SinDerivadas 3.0 Estados Unidos de América | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | * |
dc.source | instname:Universidad Antonio Nariño | es_ES |
dc.source | reponame:Repositorio Institucional UAN | es_ES |
dc.source | instname:Universidad Antonio Nariño | es_ES |
dc.source | reponame:Repositorio Institucional UAN | es_ES |
dc.subject | Motores de combustión interna | es_ES |
dc.title | Aplicación de los métodos GUM y Monte Carlo para el análisis de la confiabilidad metrológica en equipos industriales: estudio de caso de los procesos térmicos en un motor de combustión interna | es_ES |
dc.type | Tesis - Trabajo de grado - Monografia - Pregrado | es_ES |
dc.publisher.program | Ingeniería Mecánica | es_ES |
dc.rights.accesRights | openAccess | es_ES |
dc.subject.keyword | Internal combustion engines | es_ES |
dc.type.spa | Trabajo de grado (Pregrado y/o Especialización) | es_ES |
dc.type.hasVersion | info:eu-repo/semantics/acceptedVersion | es_ES |
dc.source.bibliographicCitation | [1] BIPM, IEC, et al. Guide to the expression of uncertainty in measurement JCGM 100: 2008. 1995. | es_ES |
dc.source.bibliographicCitation | [2] Yang, J., Reichert, P., Abbaspour, K. C., Xia, J., & Yang, H. (2008). Comparing uncertainty analysis techniques for a SWAT application to the Chaohe Basin in China. Journal of Hydrology, 358(1-2), 1-23. | es_ES |
dc.source.bibliographicCitation | [3] Liu, J. (2001). Uncertainty analysis for temperature prediction of biological bodies subject to randomly spatial heating. Journal of Biomechanics, 34(12), 1637-1642. | es_ES |
dc.source.bibliographicCitation | [4] Dupont, M. N., Eklund, M. D., Caracappa, P. F., & Ji, W. (2020). Experimental measurements of isothermal reactivity coefficient and temperature-dependent reactivity changes with associated uncertainty evaluations. Progress in Nuclear Energy, 118, 103131. | es_ES |
dc.source.bibliographicCitation | [5] Lavagnoli, S., De Maesschalck, C., & Paniagua, G. (2015). Uncertainty analysis of adiabatic wall temperature measurements in turbine experiments. Applied Thermal Engineering, 82, 170-181. | es_ES |
dc.source.bibliographicCitation | [6] CEM. Evaluación de datos de medición —Suplemento 1 de la “Guía para la expresión de la incertidumbre de medida”— Propagación de distribuciones aplicando el método de Monte Carlo. JCGM 101: 2008.. | es_ES |
dc.source.bibliographicCitation | [7] ISO/IEC 17025:2017(es). Requisitos generales para la competencia de los laboratorios de ensayo y calibración | es_ES |
dc.source.bibliographicCitation | [8] Zhang, C., Zhang, B., & Lin, Z. (2020, June). The Implementation and Result Processing of Highway Engineering Metrology Comparison. In Journal of Physics: Conference Series (Vol. 1549, No. 2, p. 022138). IOP Publishing. | es_ES |
dc.source.bibliographicCitation | [9] Velychko, O., Gordiyenko, T., & Karpenko, S. (2020). Evaluation of the results of regional metrology organisation comparisons and national inter-laboratory comparisons for electrical quantities. ACTA IMEKO, 9(2), 18-24 | es_ES |
dc.source.bibliographicCitation | [10] Lucon, E., Lucon, E., & Santoyo, R. (2019). Charpy Interlaboratory Comparison Between NIST and the Beijing Institute of Metrology (BIM). US Department of Commerce, National Institute of Standards and Technology. | es_ES |
dc.description.degreename | Ingeniero(a) Mecánico(a) | es_ES |
dc.description.degreelevel | Pregrado | es_ES |
dc.publisher.faculty | Facultad de Ingeniería Mecánica, Electrónica y Biomédica | es_ES |
dc.description.notes | Presencial | es_ES |
dc.creator.cedula | 20451623269 | es_ES |
dc.publisher.campus | Puerto Colombia Barranquilla | es_ES |
dc.description.degreetype | Proyecto | es_ES |
Aparece en las colecciones: | Ingeniería mecánica |
Ficheros en este ítem:
Fichero | Tamaño | |
---|---|---|
2022_LuizMeza | 1.93 MB | Visualizar/Abrir |
2022_LuisMeza_Acta Restricted Access | 159.04 kB | Visualizar/Abrir Request a copy |
2022_LuisMeza_Autorizacion Restricted Access | 525.95 kB | Visualizar/Abrir Request a copy |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons