dc.contributor.advisor | Manrique Espindola, Ramon de Jesus | - |
dc.creator | Bolivar Lara, Luis Alejandro | - |
dc.date.accessioned | 2022-08-09T20:09:07Z | - |
dc.date.available | 2022-08-09T20:09:07Z | - |
dc.date.created | 2022-05-26 | - |
dc.identifier.uri | http://repositorio.uan.edu.co/handle/123456789/6734 | - |
dc.description.abstract | The following work is carried out during the development of the internship in the company GM Construcciones Asociados S.A.S located in the city of Sogamoso Boyacá, which designs, builds and sells real estate projects. Where it is currently in the construction of the Torres del Norte multifamily project, which consists of 3 apartment towers. Tower 3 of 8 levels, tower 2 of 10 levels and in tower 1 where the internship is developed, which consists of 12 levels where budget controls of the work will be carried out from the sixth plate to the tenth plate, which are construction phases in which that the student will be present. This document presents the report to the support in the project budgets where the necessary information is collected such as the project plans, material costs through billing and quotes and with this the calculations of the respective quantities of the project in the current phase are made. and the APU's necessary to calculate the direct costs of the project, this putting into practice the knowledge obtained by the intern. | es_ES |
dc.description.tableofcontents | El siguiente trabajo se realiza durante el desarrollo de la pasantía en la empresa GM construcciones asociados S.A.S ubicado en la ciudad de Sogamoso Boyacá, el cual diseña, construye y vende proyectos inmobiliarios. Donde actualmente se encuentra en la construcción del proyecto multifamiliar Torres del Norte, la cual consta de 3 torres de apartamentos. Torre 3 de 8 niveles, torre 2 de 10 niveles y en torre 1 donde se desarrolla la pasantía que consta de 12 niveles donde se realizarán controles de presupuestos de la obra desde la sexta placa hasta la décima placa que las cuales son fases constructivas en las que el estudiante estará Presente. Este documento presenta el informe al apoyo en los presupuestos del proyecto donde se recolectó la información necesario como los planos del proyecto, costos de materiales a través de facturación y cotizaciones y con esto se realiza los cálculos de las respectivas cantidades del proyecto en la fase actual y los APU’s necesarios para calcular los costos directos del proyecto, esto poniendo en práctica los conocimientos conseguidos por el pasante. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Universidad Antonio Nariño | es_ES |
dc.rights | Atribución-SinDerivadas 3.0 Estados Unidos de América | * |
dc.rights | Atribución-SinDerivadas 3.0 Estados Unidos de América | * |
dc.rights | Atribución-SinDerivadas 3.0 Estados Unidos de América | * |
dc.rights | Atribución-SinDerivadas 3.0 Estados Unidos de América | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nd/3.0/us/ | * |
dc.source | instname:Universidad Antonio Nariño | es_ES |
dc.source | reponame:Repositorio Institucional UAN | es_ES |
dc.source | instname:Universidad Antonio Nariño | es_ES |
dc.source | reponame:Repositorio Institucional UAN | es_ES |
dc.subject | Presupuesto | es_ES |
dc.subject | Cantidades de obra | es_ES |
dc.subject | APU’S | es_ES |
dc.title | Apoyo en la elaboración y control del presupuesto del proyecto multifamiliar Torres del Norte en la ciudad de Sogamoso | es_ES |
dc.type | Tesis - Trabajo de grado - Monografia - Pregrado | es_ES |
dc.publisher.program | Ingeniería Civil | es_ES |
dc.rights.accesRights | openAccess | es_ES |
dc.subject.keyword | Budget | es_ES |
dc.subject.keyword | Quantities of work | es_ES |
dc.subject.keyword | APU'S | es_ES |
dc.type.spa | Trabajo de grado (Pregrado y/o Especialización) | es_ES |
dc.type.hasVersion | info:eu-repo/semantics/acceptedVersion | es_ES |
dc.source.bibliographicCitation | Baya de gota. (2019). Prácticas de construcción para el desarrollo de la tierra: una guía de campo para ingenieros civiles. McGraw-Hill Education. Obtenido de https://ezproxy.uan.edu.co:2107/content/book/9781260440775/chapter/chapter4 | es_ES |
dc.source.bibliographicCitation | Cabrera Montes, F., & Lavayen Mendez, F. (31 de OCTUBRE de 2018). COSTOS Y PRESUPUESTOS: ¿CÓMO DETERMINAR LOS COSTOS DE UNA OBRA? Recuperado el 23 de SEPTIEMBRE de 2021, de EL OFICIAL INFORMACION QUE CONSTRUYE: https://eloficial.ec/modulo-3-costos-y-presupuestos-comodeterminar-los-costos-de-una-obra/ | es_ES |
dc.source.bibliographicCitation | Cuadrado Muñoz, M. E. (2020). ELABORACIÓN DEL PRESUPUESTO DE OBRA DEL PROYECTO DE VIVIENDA DE INTERÉS SOCIAL “MIRADOR DE LA FONTANA". Obtenido de https://bibliotecadigital.udea.edu.co/bitstream/10495/16016/1/CuadradoMelkin_202 0_PresupuestoObraProyecto.pdf | es_ES |
dc.source.bibliographicCitation | Delgado Sayan, R. (11 de Abril de 2019). Infraestructuras "sobrecostos". Obtenido de Lampadia.com: https://www.lampadia.com/analisis/infraestructuras/sobrecostos/ | es_ES |
dc.source.bibliographicCitation | Duran, E. J. (S.F). Organizacion de obras. Obtenido de cantidades de obra: https://organizaciondeobras.wordpress.com/cantidades-de-obra/ | es_ES |
dc.source.bibliographicCitation | Garzon Gonzalez, M. P. (2020). PASANTÍA APOYO TÉCNICO AL DESARROLLO DE PROYECTOS DE OBRAS CIVILES DE LA EMPRESA MINERA OPERACIONES E INVERSIONES DE LA SABANA S.A.S. Tunja, Colombia. | es_ES |
dc.source.bibliographicCitation | Gonzales, M. (26 de Abril de 2021). Presupuesto. Qué es, importancia, elementos, características, tipos, componentes. Obtenido de gestiopolis: https://www.gestiopolis.com/presupuesto-que-es-importancia-elementos-tipos/ | es_ES |
dc.source.bibliographicCitation | Javela Quiñones, A. (2016). PASANTÍA REALIZADA COMO AUXILIAR DE INGENIERÍA EN EL ÁREA DE COSTOS Y PRESUPUESTO EN EL PROYECTO VIAL: “ESTUDIOS Y DISEÑOS PARA LA PROLONGACIÓN DE LA PARALELA ORIENTAL DE LA AUTOPISTA DE BUCARAMANGAFLORIDABLANCA”. Obtenido de Universidad distrital Fracisco Jose de Caldas: https://repository.udistrital.edu.co/handle/11349/3187 | es_ES |
dc.source.bibliographicCitation | Oliveira, M. D., & Maria, H. F. (23 de Febrero de 2021). Eficiencia de la Planificación en Obras Públicas. Revista Científica Multidisciplinar Núcleo del Conocimiento, 09(02), 148-165. Obtenido de https://www.nucleodoconhecimento.com.br/administracion-de-empresas/eficienciade-la-planificacion | es_ES |
dc.source.bibliographicCitation | Porras Moya, D. A., & Diaz, J. E. (2015). la planeación y la ejecución de las obras de construccion dentro de las buenas practicas de la administracion y programacion (proyecto torres de la 26 Bogota). Bogota. Obtenido de https://repository.ucatolica.edu.co/bitstream/10983/2951/4/LA%20PLANEACI%C3 %93N%20Y%20EJECUCI%C3%93N%20DE%20LAS%20OBRAS%20DE%20CONSTRUCCI%C3%93N%20DENTRO%20DE%20LAS%20BUENAS%20PR%C 3%81CTICAS%20DE%20LA%20ADMIN.pdf | es_ES |
dc.source.bibliographicCitation | Rivera, R. (S.F). Análisis de precios unitarios. Obtenido de elpreciounitario.com: https://elpreciounitario.com/analisis-de-precios-unitarios/ | es_ES |
dc.source.bibliographicCitation | Siraborian, N., & Rifaldi, A. (S:F). Documentacion del proyecto. Obtenido de Cátedra ingeniería "unlp": https://catedra.ing.unlp.edu.ar/electrotecnia/sispot/Libros%202007/libros/et/et06/et-060.htm | es_ES |
dc.description.degreename | Ingeniero(a) Civil | es_ES |
dc.description.degreelevel | Pregrado | es_ES |
dc.publisher.faculty | Facultad de Ingeniería Civil | es_ES |
dc.audience | Especializada | es_ES |
dc.description.notes | Presencial | es_ES |
dc.creator.cedula | 20481817694 | es_ES |
dc.publisher.campus | Duitama | es_ES |
dc.description.degreetype | Pasantía | es_ES |
Aparece en las colecciones: | Ingeniería civil |
Ficheros en este ítem:
Fichero | Tamaño | |
---|---|---|
2022_LuisAlejandroBolivaLara.pdf | 7.38 MB | Visualizar/Abrir |
2022_LuisAlejandroBolivar_Anexo 1.dwg | 9.75 MB | Visualizar/Abrir |
2022_LuisAlejandroBolivar_Anexo 2.dwg | 1.08 MB | Visualizar/Abrir |
2022_LuisAlejandroBolivar_Anexo 3.xlsx | 3.67 MB | Visualizar/Abrir |
2022_LuisAlejandroBolivar_Anexo 4.dwg | 3.3 MB | Visualizar/Abrir |
2022_LuisAlejandroBolivarLara_Acta.pdf Restricted Access | 207.23 kB | Visualizar/Abrir Request a copy |
2022_LuisAlejandroBolivar_Autorización.pdf Restricted Access | 904.79 kB | Visualizar/Abrir Request a copy |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons