Por favor, use este identificador para citar o enlazar este ítem:
http://repositorio.uan.edu.co/handle/123456789/8740
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Montealegre Ramírez, Yeison Norberto | - |
dc.coverage.spatial | Neiva (Huila, Colombia) | es_ES |
dc.creator | Barón Valencia, Luis Eduardo | - |
dc.date.accessioned | 2023-09-28T20:20:02Z | - |
dc.date.available | 2023-09-28T20:20:02Z | - |
dc.date.created | 2023-05-30 | - |
dc.identifier.uri | http://repositorio.uan.edu.co/handle/123456789/8740 | - |
dc.description.abstract | Nowadays, the Terminal de Transporte de Neiva S.A. is in constant growth, which is why its set of electrical plants is of critical importance, therefore, the company requires a preventive maintenance plan to ensure the supply of electricity in the event of outages that may occur by the energy distribution company. Currently, the Terminal de Transporte de Neiva S.A. has a corrective maintenance plan (when the failure is already present) which causes unavailability in emergency cases, generating high maintenance costs, economic lossesfor not being able to perform its activities normally, for not having the necessary spare parts, since its focus is focused on solving only the failures that are found at that time, causing low rates of availability and reliability in the set of power plants of the Terminal de Transporte de Neiva S.A. This situation has led the company to consider an effective and immediate solution, for which it is proposed to implement a preventive maintenance plan based on reliability (RBM), once this preventive maintenance plan is implemented, it will be executed in the set of power plants installed in the Terminal de Transporte de Neiva S.A. With this implementation it is expected to increase the availability and reliability rates to 90%, it is also expected that the student will apply the knowledge acquired during his training as a Mechanical Engineer. | es_ES |
dc.description.tableofcontents | Hoy en día, el Terminal de Transporte de Neiva S.A se encuentra en constante crecimiento, es por esto que su conjunto de plantas eléctricas es de critica importancia, por lo cual, la empresa requiere de un plan de mantenimiento preventivo que garanticen el suministro de energía eléctrica ante cortes que se puedan presentar por la Empresa Distribuidora de energía. Actualmente, el Terminal de Transporte de Neiva S.A cuenta con un plan de mantenimiento correctivo (cuando ya se presenta la falla) el cual ocasiona que se presente indisponibilidad en casos de emergencia, generando altos costos de mantenimiento, pérdidas económicas por no poder realizar sus actividades con normalidad, por no contar con los repuestos necesarios, dado que su enfoque se centra en solucionar únicamente, las fallas que se encuentren en ese momento, ocasionando bajos índices de disponibilidad y confiabilidad en el conjunto de plantas eléctricas del Terminal de Transporte de Neiva S.A. Esta situación ha llevado a la empresa a plantearse una solución efectiva e inmediata, por la cual, se propone implementar un plan de mantenimiento preventivo basado en la confiabilidad (RBM), una vez realizado este plan de mantenimiento preventivo, se ejecutará en el conjunto de plantas eléctricas instaladas en el Terminal de Transporte de Neiva S.A. Con esta implementación se espera aumentar los índices de disponibilidad y confiabilidad a un 90%, también se espera que el estudiante aplique los conocimientos adquiridos durante su formación como Ingeniero Mecánico | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Universidad Antonio Nariño | es_ES |
dc.source | instname:Universidad Antonio Nariño | es_ES |
dc.source | reponame:Repositorio Institucional UAN | es_ES |
dc.source | instname:Universidad Antonio Nariño | es_ES |
dc.source | reponame:Repositorio Institucional UAN | es_ES |
dc.subject | Plantas eléctricas, | es_ES |
dc.subject | Mantenimiento preventivo, | es_ES |
dc.subject | Plan de mantenimiento, | es_ES |
dc.subject | Mantención basada en la confiabilidad (RBM), | es_ES |
dc.subject | Herramientas | es_ES |
dc.title | Diseño y ejecución de plan de mantenimiento preventivo para el sistema de plantas eléctricas en el terminal de transporte de Neiva s.a. | es_ES |
dc.type | Tesis - Trabajo de grado - Monografia - Pregrado | es_ES |
dc.publisher.program | Ingeniería Mecánica | es_ES |
dc.rights.accesRights | openAccess | es_ES |
dc.subject.keyword | Power plants, | es_ES |
dc.subject.keyword | preventive maintenance, | es_ES |
dc.subject.keyword | maintenance plan, | es_ES |
dc.subject.keyword | Reliability-based maintenance (RBM), | es_ES |
dc.subject.keyword | tools | es_ES |
dc.type.spa | Trabajo de grado (Pregrado y/o Especialización) | es_ES |
dc.type.hasVersion | info:eu-repo/semantics/acceptedVersion | es_ES |
dc.source.bibliographicCitation | Richard (Doc.) D. Palmer “Manual de planificación y programación de mantenimiento (Maintenance Planning and Scheduling Handbook)” Publicado por la editorial McGrawHill Education. | es_ES |
dc.source.bibliographicCitation | “Implementación del mantenimiento preventivo para mejorar la disponibilidad de la maquinaria en la empresa Grúas América S.A.C Santa Anita, 2017.” Alberto Martin Vega Acuña, Lima-Perú 2017. | es_ES |
dc.source.bibliographicCitation | “Revisión Del Plan De Mantenimiento De Las Plantas Eléctricas Del Edificio Mario Laserna De La Universidad De Los Andes” Camilo Andrés Malaver Leal, Bogotá-Colombia 2022. | es_ES |
dc.source.bibliographicCitation | “Manual de operación para plantas de emergencia” San Salvador, diciembre 1998. | es_ES |
dc.source.bibliographicCitation | “DISEÑO DE UN PLAN DE MANTENIMIENTO PREVENTIVO PARA LA EMPRESA EXTRUPLAS S.A” Juan Camilo Valdiviano, Cuenca 2010. | es_ES |
dc.source.bibliographicCitation | “Metodología de la investigación: las rutas cuantitativa, cualitativa y mixta” del autor Dr. Roberto Hernández Sampieri. | es_ES |
dc.source.bibliographicCitation | Revisión Del Plan De Mantenimiento De Las Plantas Eléctricas Del Edificio MarioLaserna De La Universidad De Los Andes, trabajo de grado Camilo Andrés Malaver Leal de la facultad de ingeniería mecánica en la universidad de los Andes. | es_ES |
dc.source.bibliographicCitation | Diseño de un plan de mantenimiento preventivo para el sistema de rociadores contra incendio, en una edificación hospitalaria (ecci.edu.co). | es_ES |
dc.source.bibliographicCitation | Qué es el Mantenimiento Centrado en la Confiabilidad (RCM) (cursosaula21.com). CUMMINS Diesel Engines Operation Maintenance Manual 1980: Free Download, Borrow, and Streaming: Internet Archive. | es_ES |
dc.source.bibliographicCitation | Libro Manual de Planificación y Programación de Mantenimiento (predictiva21.com). “DISPONIBILIDAD, CONFIABILIDAD Y PRODUCTIVIDAD DE UNIDADES | es_ES |
dc.description.degreename | Ingeniero(a) Mecánico(a) | es_ES |
dc.description.degreelevel | Pregrado | es_ES |
dc.publisher.faculty | Facultad de Ingeniería Mecánica, Electrónica y Biomédica | es_ES |
dc.audience | Especializada | es_ES |
dc.description.notes | Presencial | es_ES |
dc.creator.cedula | 20451923983 | es_ES |
dc.publisher.campus | Neiva Buganviles | es_ES |
dc.description.degreetype | Monografía | es_ES |
Aparece en las colecciones: | Ingeniería mecánica |
Ficheros en este ítem:
Fichero | Tamaño | |
---|---|---|
2023_LuisBarón | 2.37 MB | Visualizar/Abrir |
2023_LuisBarón _Autorización Restricted Access | 991.52 kB | Visualizar/Abrir Request a copy |
2023_LuisBarón _Acta Restricted Access | 162.01 kB | Visualizar/Abrir Request a copy |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.